Sylvia Park - Stage Two
As well as Commercial Glass and Glazing doing extensive work at Nuffield St, straight after completing that fitout we automatically went into the installation of shopfronts for Sylvia Park, Stage Two.
Again we were fortunate to gain a considerable amount of shopfront work as well as mirrors, shelves to the shop interior.
|
|
| |
 |
Roxy
This would be one of the largest shopfronts our company has installed.
All the glass was 19mm thick clear toughened glass at a height of 3950mm.
Each panel weighed approximately 400kg with a requirement of our company.
|
|
| |
Oroton
This shopfront comprised of 15mm and 12mm clear toughened glass in U channel all glass had clear silicone joints. Along with the supply and install of mirrors to inside of shop.
|
|
 |
| |
 |
Esprit
This shopfrront was a relatively easy fit out as it comprised of only three fixed panels, 15mm clear toughened glass fitted into U channel. This shop well and truly stands out amongst the rest. All credit goes to Michael, John and the fit out team on such a eyecatching shop.
|
|
| |
Hallensteins
A very popoular shop with very big shopfronts. This shopfront also required our manual glass lifting device to set our glass panels in place. A very big thanks to Gulf Projects who associate our company as their glazing contractor for many of their shop fit outs.
|
|
 |